Hat Yai municipality plans to add 250,000 cubic metres to the Khlong Riang retention pond (from 530,000) and raise Khlong Toei drainage from 160 to 250 cubic metres per second. Separately, ARDA's Radar4Flood system, already running in four pilot river basins, updates rainfall every 10 minutes and forecasts flash floods and landslides up to 24 hours ahead. It is being extended to Songkhla and Phatthalung in 2026. If your business is in a flood-prone area such as Songkhla, you can use the free-to-read alerts to move stock, equipment or vehicles early. The article gives no sign-up or cost details, so check with local authorities before relying on it.
← Back to all articles