Flooding inside Amata City Chonburi is still high: Phase 8 and 9 average 60 cm, Phase 7 about 30 cm, Phase 10 about 10 cm. Pumping was raised from 34,000 to 42,500 m³/hr, and the estate is repairing damaged dykes. After water recedes, the estate authority (IEAT) and Amata will survey tenant damage to plan relief. Longer term, a retention-pond plan could add about 100 million m³ of capacity. If your business operates in or supplies to this estate, plan for possible production delays, and keep damage records and photos for any relief claim.
← Back to all articles