Bangkok governor Chadchart said flood levels have stabilised after heavy rain from 24 Sept. Rain is expected to ease by afternoon and evening. BMA pumps are at full capacity and expects 2–3 days to drain standing water, though water from surrounding areas may keep flowing in. About 93 roads are flooded, including Ekkamai, Ratchadaphisek, Lat Phrao, Phahon Yothin and Ramkhamhaeng. Plan delivery routes and stock around these roads, move stock off ground floors near canals, and check the BMA road-flood monitoring system before sending staff out.
← Back to all articles